Wednesday 20 March 2013

BMC 15 FOB Construction Work not start after 1 year



The Brihanmumbai Municipal Corporation is totally fail to even start Construction after 1 year. Its Reveals by RTI filed by Athak Seva Sangh.

Athak Seva Sangh   ask Bmc bridges Dept that What is the reason to not start foot overbridges (FOB) after its sanction and provide the total number of bridges throughout City.  BMC bridges dept Executive Engineer reply that there are total 73 bridges under BMC. Bmc pay Rs 16.1 Crores to Railway for the work of FOB at Railway premises. Bmc Sanction total 15 new FOB  on 2 Jan 2012 in  the city on Design-Build-Operate-Transfer (DBOT) basis. 

The bridges are as following.1) Extension of FOB at Matunga Railway Station near Ruparel college across Senapati Bapat Marg at Matunga (Western Railway) in G North ward 2) FOB at Yellow bunglow bus stop at Sion- Bandra link Road 3)  FOB at  Mahim Phatak to Senapati Bapat Marg between Electric pole 7 to 9 at Mahim Railway Station 4) FOB at  Near Phoenix Mill, opp Empire house across Senapati Bapat Marg in G South Ward 5) FOB at  Worli Naka in G South ward 6) FOB at  Nehru Planetarium near NAB School across Dr A B Road in G South Ward 7) FOB at  Across G M Link road at Mohite Patil Nagar (PMGP Colony)in M East Ward 8) FOB at LBS Marg fron St Michael School to SBI, Kurla West in L ward 9) FOB at Lal Dongar across V N Purav Marg in M West Ward 10) FOB at Ghatkopar Mankhurd link Road at Indian Oil Nagar in M East Ward 11) FOB at  St Xavier's School to Birla Company,Kanjurmarg West in S ward 12) FOB at  Sathe Nagar on Ghatkopar Mankhurd link Road in M east Ward 13) FOB at  Goregaon -Mulund link Road(near kokan Swad Hotel) Bangur Nagar Signal Goregaon West in P South Ward 14) FOB at  Dahisar River Near Gaothan Dahisar West in R North ward 15) FOB at  NAB office at Khan Abdul Gaffar khan Road,Worli Seaface. 
Bmc avoid the reason to not start FOB work after sanction in 2012, they give reply that they don't understand what RTI want to say.

To construct 15 foot overbridges in the city which will cost the Contracter around  Rs 25,63,13,127 . Bmc will be given advertising rights for the bridges for the next 15 years through which contracter can recover their construction cost.”

We wrote to Municipal Commissioner Sitaram Kunte and demand to act fast to start the construction of all bridge work so number of accidents will be control and the Basic idea to Construction such FOB will success.

No comments:

Post a Comment